AI Employee · Real Estate & Construction Operations

Meet Your AI RFI & Submittals Coordinator
That Never Clocks Out

Talk to it like a senior project engineer. Connect Procore, Autodesk Construction Cloud, PlanGrid, and Bluebeam — it converts superintendent site photos into code-compliant RFIs, audits submittal cut-sheets against CSI MasterFormat specs, and eliminates critical-path delays 24/7.

RC
RhinoAgents AI RFI Coordinator
Online · Auditing Procore Specs & Blueprints
SUPERINTENDENT
"Level 3 ductwork on Grid Line C-4 clashes with structural W18x50 steel girder. Draft an RFI to the structural engineer with a suggested offset solution."
RC
Cross-referencing Mechanical Sheet M-201, Structural Sheet S-103, and Project Spec Section 23 31 13 (HVAC Ducts)…
M-201 & S-103 Clash Analysis CSI Section 23 31 13 Spec Check Procore RFI #104 Drafted
RC
RFI #104 Prepared for Architect/Engineer Review:
Subject: Spatial Conflict Between 24x12 Supply Duct and W18x50 Girder at Grid C-4.
Impact Analysis: Zero critical path schedule delay if resolved within 48h. Potential change order cost: $0.
Proposed Solution: Split supply main into two 16x10 branches with 45° transitional offsets to maintain minimum 8'-6" finished ceiling clearance.
Status: Exported to Procore RFI Log and routed to Structural Engineer of Record (Thornton Tomasetti).
View RFI #104 PDF Audit 8 Pending Submittals Send to Architect
Zero Field Rework

An Autonomous Site Engineer, Not a Filing System

Traditional project management software only stores documents. Your AI RFI Coordinator actively inspects blueprints, detects drawing contradictions, audits vendor submittals against CSI spec books, and writes formal engineering queries in minutes.

Sub-24 Hour RFI Turnaround

Drafts comprehensive, spec-cited RFIs with proposed solutions so engineers can approve with 1 click.

Automated Submittal Compliance Stamping

Compares vendor cut-sheets against ASTM/UL specifications and prepares review stamps automatically.

Manual Project Engineer vs. AI RFI Coordinator
❌ Manual Project Engineering
✅ AI RFI Coordinator
7 to 10 days average RFI turnaround cycle
<24 hours RFI generation and resolution
Vague questions lead to rejected/delayed RFIs
100% cited drawing sheets, grids & spec sections
Submittals reviewed manually for hours per trade
Automated ASTM spec compliance auditing
Uncaught drawing clashes cause costly rework
Spatial MEP vs structural clash detection
$85k–$110k/year salary per Project Engineer
Unlimited project capacity at a predictable flat fee
Setup in 60 Minutes

Connected to Your Jobsite in 4 Steps

Link your construction management platform, project spec books, and drawing sets with zero IT tickets.

1
Connect Procore / BIM
Link Procore, Autodesk Construction Cloud, or Bluebeam to ingest project drawings and logs.
Procore Sync
2
Upload Spec Books
Ingest full CSI MasterFormat project specifications, geotechnical reports, and addenda.
CSI Specs
3
Triage Field Inquiries
AI takes superintendent notes and drafts formal RFIs with proposed architectural solutions.
Auto RFI
4
Audit Submittals & Log
Reviews subcontractor cut-sheets, verifies compliance, and updates project logs in real time.
Submittal Stamping
Live Dialogues

See Exactly How It Manages Jobsite Engineering

Explore real conversations handled across structural clash RFIs, submittal cut-sheet audits, and spec addenda revisions.

RC
AI RFI & Submittals Coordinator • Live Jobsite Sync
FIELD SUPER
"Plumbing 4-inch sanitary main on Level 2 hits a post-tensioned cable tendon on Sheet S-202. What do we do?"
RC
🚨 Critical Structural RFI Drafted (#RFI-118):
Location: Level 2 Slab Penetration, Grid D-6.
Warning: Core drilling is strictly prohibited within 12 inches of PT tendons per Section 03 38 00.
Proposed Solution: Offset sanitary stack 18" East to clear tendon bundle #PT-4 and sleeve through pre-approved blockout on Detail 4/S-501. Submitted to Structural Engineer for sign-off.
PROJECT MGR
"Review subcontractor submittal #SUB-082 for Division 08 Door Hardware."
RC
Submittal Audit Completed (Status: Revise & Resubmit):
Conforming: Locksets meet ANSI/BHMA Grade 1 requirements.
❌ Non-Conformance Flagged: Proposed door closers are standard non-hold-open, whereas Spec Section 08 71 00, Paragraph 2.3 requires UL 10C 90-minute fire-rated electromagnetic hold-open closers for Stairwell 2 doors. Submittal stamped and returned to Door Trade.
PROJECT MGR
"Architect issued Addendum #3 drawing set. What changed across architectural sheets?"
RC
Addendum #3 Visual Delta Analysis:
Sheet A-102: Restroom layout reconfigured to meet ADA accessibility clearances (+120 sq ft ceramic tile).
Sheet A-401: Window wall glazing spec changed from double-pane to triple-pane acoustic laminate.
Action Taken: 3 pending RFIs automatically marked resolved. Subcontractor bid scope revisions notified.
You
Evaluate cost and critical path schedule impact for RFI #112 structural footing depth increase.
RC
✅ Schedule Impact: 0 days critical path delay (Foundation trade working North wing first).
✅ Estimated Cost: $6,420.00 for additional 14 CY of 4,000 PSI concrete and rebar.
✅ Drafted Potential Change Order (PCO #018) in Procore ready for Owner approval.
Enterprise Feature Mapping

Every Jobsite Engineering Workflow. Powered by RhinoAgents.

Your AI RFI Coordinator is powered by our enterprise control plane and autonomous construction engineering runtime.

Construction Problem
Slow 10-day RFI responses from architects halt field crews, causing compounding project delays.
Instant RFI Formulation
Drafts clear, code-cited questions with engineering solutions so architects can approve on first pass.
<24h
average RFI turnaround cycle time from jobsite to approved answer
Construction Problem
Project engineers spend 15 hours a week reviewing dense subcontractor product submittal cut-sheets.
Automated Submittal Stamping
Compares technical product data against CSI MasterFormat project specifications line-by-line.
90%
reduction in manual submittal review time for project engineers
Construction Problem
Unnoticed blueprint drawing discrepancies result in costly field tear-outs and rework.
Multi-Discipline Clash Radar
Scans architectural, structural, and MEP drawings to catch design conflicts before pouring concrete.
-$180k
average annual savings in avoided demolition, rework, and change orders
Full Capability Set

Everything a Construction Project Engineer Does. Automated.

From jobsite photo RFI formulation to final closeout submittal packages, your AI employee covers the entire construction engineering lifecycle.

Automated RFI Formulation
Converts field superintendent voice notes into formal, code-compliant RFIs citing exact sheet coordinates and CSI spec sections.
Procore RFICSI MasterFormatSheet Grid
Submittal Compliance Auditing
Audits trade subcontractor product data cut-sheets and shop drawings against ASTM, ANSI, and UL project specifications.
SubmittalsCut-SheetsASTM Ratings
Multi-Discipline Clash Detection
Cross-references architectural drawings, structural calculations, and MEP duct/pipe models to isolate spatial clashes.
MEP vs SteelSpatial ClashBIM 360
Addenda Visual Delta Analysis
Performs computer vision diff comparisons across revision drawing sets to pinpoint modified dimensions, callouts, and notes.
Addenda DiffRevision DeltaBluebeam Revu
PCO & Schedule Delay Modeling
Evaluates critical path schedule impacts and calculates potential change order (PCO) cost liabilities before submitting RFIs.
PCO CostsCritical PathSchedule Risk
2-Way Procore & Field Sync
Automatically parses architect email responses, updates drawing logs, and pushes instant notifications to affected trade subs.
Procore APIAutodesk ACCSub Notification
Human-in-the-Loop

Full Speed. Full Engineering Governance.

Your AI RFI Coordinator formulates queries and audits cut-sheets autonomously, but requires Project Manager sign-off before official submission to the Architect or Owner.

1

RFI Formulated & Verified

Drawings cross-referenced, code citations attached, and design workarounds proposed.

2

PCO Cost / Schedule Flagged

If an RFI involves a potential change order (>$5,000) or critical path risk, it pauses for PM review.

3

1-Click PM Submission

Project Managers review the RFI packet on mobile and click Submit to Architect in Procore.

Slack Notification • #project-engineering-rfis
⚠️ High-Priority RFI Sign-Off Required:
Project: Skyline Medical Center Tower (Phase 2)
RFI #112: Elevator Pit Waterproofing Membrane Spec Conflict (Division 07 vs Detail 3/A-501)
PCO Cost Impact: +$8,200.00 | Schedule Delay: 0 Days
Integrations

Connects to Your Entire Construction Tech Stack

Native 2-way connectors for project management platforms, BIM software, blueprint viewers, and mobile field tools.

Procore Autodesk Construction Cloud BIM 360 Bluebeam Revu PlanGrid Trimble Connect Fieldwire Revit Slack & Teams
Real-Time Observability

Complete Project Engineering Visibility

Track average RFI cycle turnaround times, submittal approval rates, pending architect reviews, and avoided change order liabilities in real time.

AI Construction Project Engineering Dashboard
18.4 hrs
Average RFI Cycle Time
97.2%
Submittal Spec Accuracy
$240k
Avoided Rework / Change Orders
Enterprise Security

Intellectual Property & Blueprint Security

Built with enterprise encryption, SOC 2 Type II controls, and zero public model training on proprietary architectural drawings.

AES-256 Blueprint Encryption
All proprietary CAD drawings, BIM models, and spec books are encrypted in transit and at rest.
SOC 2 Type II Certified
Strict security controls ensure subcontractor bids and proprietary engineering details never leak.
Role-Based Access Control
Granular permissions dictate which project engineers and trade subcontractors can view specific RFI logs.
Frequently Asked Questions

Everything General Contractors Need to Know

Clear answers on Procore integrations, CSI MasterFormat spec parsing, submittal compliance, and change orders.

How does the AI draft RFIs from jobsite photos and voice notes?
Superintendents can send a voice memo or jobsite photo via Slack/Teams or mobile app. The AI identifies the location, cross-references project blueprint coordinates and CSI spec divisions, and generates a formal, code-compliant RFI draft with proposed solutions.
Can it review subcontractor submittal cut-sheets against spec books?
Yes. The AI extracts technical specifications from vendor cut-sheets (e.g. ASTM tensile strength, fire ratings, CFM airflow, warranty lengths) and compares them line-by-line against your project specification book, generating an automated review stamp and itemized deviation log.
How does it integrate directly into Procore and Autodesk Construction Cloud?
Using official 2-way REST APIs, the AI syncs with your active Procore or Autodesk ACC project. It creates RFI drafts, updates submittal logs, and synchronizes drawing revisions in real time.
How long does onboarding a new construction project take?
Connecting your Procore account takes under 15 minutes. Ingesting full project drawing sets and 50-division CSI specification books takes approximately 1–2 hours.
Eliminate Jobsite Delays

Deploy Your AI Construction RFI Coordinator

Connect Procore and your project spec books in minutes to achieve sub-24-hour RFI turnaround and zero field rework.